Micrologix 500 Manual

I am assuming you are talking about RSLOGIX 500. This software serves The SLC 500 family, as well as micrologix PLC's, the RSLOGIX 5 is used for PLC 5 systems.

  1. Program A-one Shot On Micrologix 500

RSLogix 500 Getting Results Guide. Publication LG500-GR002H-EN-E - November 2015. Supersedes Publication LG500-GR002G-EN-E. Purpose of This Manual This manual is a reference guide for MicroLogix 1200. Refer to your RSLogix 500 programming. MicroLogix 1200 Programmable Controllers.

It is almost Identical to RSLOGIX 500. The primary PLC configuration takes place in the I/O configuration. There are also channel configuratios, but those usually don't need to be used in a PLC that doesn't need to communicate with other PLC's or computers. The micrologix generally doesn't need much other than for you to select the processor. For an SLC 500, you will need to configure what cards are in which slots. If you don't, and load the Program to the processor, the processor will fault.

Micrologix 500 Manual

Double click the I/O configuration to open the window. If you are connected to the PLC, you can choose read I/O config. If not select the card from the list, and drag it to the appropriate slot. Not sure what the model of module card you have, power down the PLC, remove the card and look on the side. The information may also be found inside the door.

Micrologix 500 manual

If you can tell me which processor you have, I can tell you how to connect to it. I have a decent amount of experience with the SLC 500, Micrologix, and the PLC 5. If you have any questions about these, I am happy to help Calvin Robertson, Maintenance Electrician-Longview Fibre, and Automation Geek. Calvin, I need advice for a specific one that you can recommend. This is the experiment scenario: There will be a special battery charger that charges only Lithium ion batteries (I have that already). There will be two banks or sets of batteries. Only one bank can be charged at a time, once the first bank is fully charged, then the 'controller' or 'PLC' will switch the battery charger to the second bank to charge that one as well.

Manual

The system that I'm experimenting will drain each bank one at a time. I want the controller to determined when a bank is drained then it will switch the battery charger to the second battery bank. This will happen back and forth. While one is discharged the other is being charged. The batteries will be 24V DC.

Program A-one Shot On Micrologix 500

Hello sir i am sureshkiran from india (salem)i am very happy to be a part of your guidence, sir i am learning AB,AB SCADA at present but further i would like to learn ABB,SIEMENCE,keeyance sorry sir if u found any spell mistake. Our trainer gave a required matter in AB.although they did not tell anything deaply. I am not underestimate their skills but i want more sir please help me how to work out the plc and which matterials much beter, if u have any free on line books sent me sir. Thankyou very much.